glossary:thomasbc3 [2019/02/26 16:33] – [BC3 Demo Retired] cjeb47glossary:thomasbc3 [2019/02/26 16:42] cjeb47
Line 7: Line 7:
  This means that the first train moves into the empty section, then the second train moves into the now empty first section followed by the the third train moving into the section vacated by the second train.   This means that the first train moves into the empty section, then the second train moves into the now empty first section followed by the the third train moving into the section vacated by the second train. 
 The first train then moves into the section vacated by the third train, and so on ad infinitum. The first train then moves into the section vacated by the third train, and so on ad infinitum.
- The signals will use the original boards, by using a trigger taken from each section of the ATC system to indicate to the signals that a section is occupied. This is still being worked on by South Hants Group.+ The signals will use the original SDS2 boards (kit 36), by using a trigger taken from each section of the ATC system to indicate to the signals that a section is occupied. 
 + 
 +Nb.p This is still being worked on at present.
  
glossary/thomasbc3.txt · Last modified: 2019/02/26 20:16 by Bob Vetterlein