User Tools

Site Tools


public:cbuspublic:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:cbuspublic:start [2019/05/04 21:38] Bob Vetterleinpublic:cbuspublic:start [2020/01/10 09:19] – [CBUS - A universal layout control system] Bob Vetterlein
Line 2: Line 2:
 [[public:cbuspublic:docindex|Documentation]]\\  [[public:cbuspublic:docindex|Documentation]]\\ 
 [[public:cbuspublic:schema|Schema files]]\\  [[public:cbuspublic:schema|Schema files]]\\ 
 +[[:public:start|Index to other public Wiki pages]]\\ 
 ==== Introduction ==== ==== Introduction ====
 When first introduced, CBUS was the product of over 4 years development by MERG members Gil Fuchs and Mike Bolton.\\ During that time CBUS went through many stages of evolution and refinement including some major changes in direction until at version 4 in 2007 it was felt sufficiently developed to formally introduce the scheme, not just for MERG members but the world at large. Since its introduction developments have continued with contributions from a much wider team of MERG members. When first introduced, CBUS was the product of over 4 years development by MERG members Gil Fuchs and Mike Bolton.\\ During that time CBUS went through many stages of evolution and refinement including some major changes in direction until at version 4 in 2007 it was felt sufficiently developed to formally introduce the scheme, not just for MERG members but the world at large. Since its introduction developments have continued with contributions from a much wider team of MERG members.
Line 73: Line 74:
   * **[[http://jmri.org/|JMRI]]**: Java Model Railroad Interface for configuration, monitoring and operating.    * **[[http://jmri.org/|JMRI]]**: Java Model Railroad Interface for configuration, monitoring and operating. 
   * **[[http://www.rocrail.net/|ROCRAIL]]**: A complete package for layout and loco operation.   * **[[http://www.rocrail.net/|ROCRAIL]]**: A complete package for layout and loco operation.
-  * **[[http://www.gppsoftware.com/ssi/|SSI]]** (Solid State Interlocker) from [[http://www.gppsoftware.com/|GPPSOFT]]: A complete layout control system following British signalling and control practice.+  * **SSI** (Solid State Interlocker) from [[http://www.gppsoftware.com/|GPPSOFT]]: A complete layout control system following British signalling and control practice.
  
 ===== Implementation Notes ===== ===== Implementation Notes =====

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki