public:shants
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
public:shants [2019/12/01 11:02] – [Scheduled meetings] ianh | public:shants [2019/12/01 11:17] – [MERG South Hampshire (Southampton) Area Group] ianh | ||
---|---|---|---|
Line 16: | Line 16: | ||
We are assisting in rebuilding one of the Southampton MRS exhibition layouts to enhance its operational capabilities and possibly add some animations.\\ | We are assisting in rebuilding one of the Southampton MRS exhibition layouts to enhance its operational capabilities and possibly add some animations.\\ | ||
- | The layout is being controlled by MERG CBUS and DCC modules. | + | The layout is being controlled by MERG CBUS and DCC modules. |
- | At the August | + | At the November |
- | All the MERG modules have now been installed | + | The Track wiring on the new rear lower level section for the storage and a reversing loop was completed |
- | The new rear lower level section for the storage and a reversing loop has been built. | + | |
Any help would be appreciated as we hope to have it ready for the Southampton show in January 2020.\\ | Any help would be appreciated as we hope to have it ready for the Southampton show in January 2020.\\ | ||
We can work on it at other times when the club room is open.\\ | We can work on it at other times when the club room is open.\\ |
public/shants.txt · Last modified: 2024/02/14 11:36 by ianh