public:shants
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
public:shants [2019/07/23 19:01] – [Exhibitions] ianh | public:shants [2019/08/22 07:55] – [MERG South Hampshire (Southampton) Area Group] ianh | ||
---|---|---|---|
Line 18: | Line 18: | ||
All the points have now been converted to servo operation. | All the points have now been converted to servo operation. | ||
Once we have got it reliably running, we hope to add JMRI on a Raspberry Pi 3B to add smart phone throttle control and a control panel using a tablet.\\ | Once we have got it reliably running, we hope to add JMRI on a Raspberry Pi 3B to add smart phone throttle control and a control panel using a tablet.\\ | ||
- | At the March workshop we agreed to use route selection to control the layout and started the procurement of components and MERG modules for the control system. The new rear section with storage and a reversing loop has added 16 more points to be controlled. | + | At the March workshop we agreed to use route selection to control the layout and started the procurement of components and MERG modules for the control system. The new rear section with storage and a reversing loop has added 16 more points to be controlled.\\ |
+ | At the August workshop we continued adding and wiring the MERG modules to the scenic section. | ||
=====Scheduled meetings===== | =====Scheduled meetings===== | ||
- | |||
- | The **July 2019** meetings will be on:\\ | ||
- | The evening of Thursday 11th July starting at 7.30pm. The club will be open from 7pm.\\ | ||
- | The all day workshop will be on Saturday 20th July. The club will be open from 09.45am.\\ | ||
The **August 2019** meetings will be on:\\ | The **August 2019** meetings will be on:\\ |
public/shants.txt · Last modified: 2024/02/14 11:36 by ianh