User Tools

Site Tools


public:vag

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:vag [2019/07/19 10:31] – [Next Meeting] uppermillpublic:vag [2019/08/13 10:53] uppermill
Line 2: Line 2:
  
 ^  Next Meeting  ^ ^  Next Meeting  ^
-|**<color red>There are <COUNTDOWN:10:00 2019-08-13|the next Virtual Meeting (10:00 BST on 13-August-2019)></color>** |+|**<color red>There are <COUNTDOWN:10:00 2019-08-27|the next Virtual Meeting (10:00 BST on 27-August-2019)></color>** |
  
 ===== MERG Virtual Area Group ===== ===== MERG Virtual Area Group =====
Line 47: Line 47:
 ==== Next Meeting ==== ==== Next Meeting ====
  
-**<color red>There are <COUNTDOWN:10:00 2019-08-13|the next Virtual Meeting (10:00 BST on 13-August-2019)></color>**+**<color red>There are <COUNTDOWN:10:00 2019-08-27|the next Virtual Meeting (10:00 BST on 27-August-2019)></color>**
  
 The proposed agenda is as  follows The proposed agenda is as  follows
  
-=== 9th July ===+=== 27th August ===
  
 ^Item^Leader^Minutes^Notes^ ^Item^Leader^Minutes^Notes^
 |  Future Topics|Discussion|  5  |Initial discussion while members join the call| |  Future Topics|Discussion|  5  |Initial discussion while members join the call|
-|  Signalling Objects for CBUS|Dave Turner|  55  |The aims of this White Paper are as follows| +|  Station Destination Boards|Discussion|  45  |An opportunity to discuss hardware and messaging systems
-|:::|:::|:::|1 To make configuration and documentation of an interlocked system easier| + Burning Topics|Discussion 10  |Does anybody need some help?|
-|:::|:::|:::|2 To add the following higher level functionality to the existing CBUS messaging system+
-|:::|:::|:::- System initialisation| +
-|:::|:::|:::| - Interlocking of modelled signalling items| +
-|:::|:::|:::| - Route reservation, locking and release| +
-|:::|:::|:::| - Reporting  of operational errors|+
  
 Once you have confirmed with the leader that you wish to participate, you will receive a reminder email on the day before the call and a second email 10 minutes before the call with a link to enable you to join the call. Once you have confirmed with the leader that you wish to participate, you will receive a reminder email on the day before the call and a second email 10 minutes before the call with a link to enable you to join the call.
Line 76: Line 71:
 I've scheduled some discussions over the holiday season so that we can deal more easily with fluctuation numbers of participants. I've scheduled some discussions over the holiday season so that we can deal more easily with fluctuation numbers of participants.
  
-=== 13th August === 
  
-^Item^Leader^Minutes^Notes^ 
-|  Future Topics|Discussion|  5  |Initial discussion while members join the call| 
-|  DC Control|Discussion|  45  |An opportunity to discuss the forgotten world of DC control| 
-|  Burning Topics|Discussion|  10  |Does anybody need some help?| 
  
-=== 27th August === 
  
-^Item^Leader^Minutes^Notes^ 
-|  Future Topics|Discussion|  5  |Initial discussion while members join the call| 
-|  Station Destination Boards|Discussion|  45  |An opportunity to discuss hardware and messaging systems| 
-|  Burning Topics|Discussion|  10  |Does anybody need some help?| 
  
 === 10th September === === 10th September ===
Line 122: Line 107:
 ==== Previous Meetings in 2019 ==== ==== Previous Meetings in 2019 ====
  
 +=== 13th August ===
 +
 +^Item^Leader^Minutes^Notes^
 +|  Future Topics|Discussion|  5  |Initial discussion while members join the call|
 +|  DC Control|Discussion|  45  |An opportunity to discuss the forgotten world of DC control|
 +|  Burning Topics|Discussion|  10  |Does anybody need some help?|
 +
 +=== 9th July ===
 +
 +^Item^Leader^Minutes^Notes^
 +|  Future Topics|Discussion|  5  |Initial discussion while members join the call|
 +|  Signalling Objects for CBUS|Dave Turner|  55  |The aims of this White Paper are as follows|
 +|:::|:::|:::|1 To make configuration and documentation of an interlocked system easier|
 +|:::|:::|:::|2 To add the following higher level functionality to the existing CBUS messaging system|
 +|:::|:::|:::| - System initialisation|
 +|:::|:::|:::| - Interlocking of modelled signalling items|
 +|:::|:::|:::| - Route reservation, locking and release|
 +|:::|:::|:::| - Reporting  of operational errors|
 === 25th June === === 25th June ===
  
public/vag.txt · Last modified: 2023/04/18 13:31 by grovenor

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki